2025 Explanation of Significant Difference
Relevant Documents
- April 2021 UH Sediment Cap RA Report (pdf)
- Aug 2018 Final Parcel 265 After Action Report (pdf)
- May 2013 Tech Memo on the "OU3" Pilot Sediment Cap (pdf)
- Memo Regarding 10/16/2024 Inspection of Upper Harbor Sediment Caps (pdf)
- Report of 11/13/2023 Inspection of Upper Harbor Sediment Caps (pdf)
- Memo Documenting 05/05/2023 Inspection of Upper Harbor Sediment Caps
- Memo Documenting 10/25/2022 Inspection of Upper Harbor Sediment Caps
- Memo Regarding 05/17/2022 Inspection of Upper Harbor Sediment Caps [Photographs Attached]
- Memo Regarding Visual Shoreline Inspection of Upper Harbor Sediment Caps, 12/03/2021 (pdf)
- Memorandum Regarding 05/26/2021 Aerovox Interim Sediment Cap Inspection
- Memorandum Regarding Completion of Remedial Action (RA) 9, Operable Unit (OU) 1, Upper Harbor Sediment Caps
- Final Upper Harbor Sediment Caps Remedial Action (RA) Report No. 9 for Operable Unit (OU) 1
- Addendum to the Final Aerovox Interim Sediment Cap 100% Design Plan (pdf)
- Interim Sediment Cap - 100% Design (pdf)
- Fact Sheet – EPA to Install Interim Sediment Cap Along Aerovox Shoreline In 2018 (pdf)