Federal Guidance Report No. 6: Revised Fallout Estimates for 1964-1965 and Verification of the 1963 Predictions
The purposes of the present report are to:
- Compare the predictions made as to the levels of fallout anticipated in 1963 with the experience based on surveillance measurements.
- Make more precise estimates of the levels anticipated in 1964 and 1965.,
- Evaluate the validity of the prediction procedures when they are applied to a changing fallout situation such as now exists. The study is based on information available through June 1964.