EPA Region 5
Serving Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin and 36 Tribes
Contacts
- Contact EPA Region 5
- Region 5 media contacts
- Region 5 Main Number: 312-353-2000 or toll-free 800-621-8431,
8:00 am to 4:30 pm Central time - [email protected]
- Organization Chart
- Region 5 Staff Contact by Topic
- Visit our offices
- Region 5 2020 End of Year Report
Events and Public Notices
-
ADM Geologic Sequestration Well - Proposed Order SDWA-05-2025-0001
EPA took action to protect underground sources of drinking water by issuing a proposed enforcement order to Archer Daniels Midland Co. for alleged violations of the Safe Drinking Water Act related to the company’s carbon sequestration injection project in
-
EPA Releases Explanation of Significant Differences for Moss-American Superfund Site
Formalized change to the existing cleanup plan at the Moss-American Superfund site in Milwaukee, WI. To address a limited area of site contamination, the EPA will use offsite disposal instead of “low temperature thermal desorption” treatment.
-
Federal Draft RCRA Permit for Altivia Petrochemicals, OHD 005 108 477
Federal Draft Permit will allow Altivia to store, manage, and treat industrial organic hazardous waste in three hazardous waste tanks.
-
ML Wastewater Management Inc NPDES Permit MN-0064637-5
EPA is public noticing this tentative decision to reissue the permit of the CWA, as amended, ML Wastewater Management, Inc. is authorized by the USEPA, Region 5, to discharge from a treatment facility designated as ML Wastewater Management, Inc.
-
Open House for the Franklin Street Groundwater Site
EPA Region 5 shares details about current and upcoming sampling activities at the Franklin Street Groundwater Site.
-
Public Meeting for the Franklin Street Groundwater Site
EPA Region 5 shares details about current and upcoming sampling activities at the Franklin Street Groundwater Site.
-
The EPA Begins 2nd 5 Year Review of WPSC Stevens Point Superfund Alternative Site
The Superfund law requires regular checkups of sites that have been cleaned up – with waste managed on-site – to make sure the cleanup continues to protect people and the environment. This 2nd 5 Yr. review is expected to be completed in October 2025.
Five-Year Review Public Notices
View the list of notices open for comment: Five-Year Review public notices.